The short answer
Start about three months out. Order business internet first, because new connections can take weeks. Then plan cabling and Wi-Fi with your fit-out, arrange your phone numbers, prepare equipment and test everything staff need before opening day. The jobs that most often hold up a move are a late internet connection, missing network points and phone numbers that weren’t arranged in time.
A short IT move-in brief to share with your team
Copy these six points into an email or your move plan. Use them to brief your IT provider, cabler and fit-out team before work starts. If you’re an agent helping an incoming occupier, you can forward this guide so the business owner can fill in the details and contact their chosen providers.
- Premises: suburb and unit or lot, plus whether it’s a factory, workshop, warehouse, shop or office.
- Timing: expected key handover, fit-out and opening dates. Mark any dates still awaiting confirmation.
- People: approximate staff numbers, shifts and shared computers, including office and dispatch teams.
- Day-one systems: Microsoft 365 email and files, job software, printers, scanners, phones and any other equipment staff rely on.
- Current arrangements: who handles IT, internet and cabling; what is moving from the old site; and which installation dates are confirmed.
- Decisions needed: who will approve the work, any budget range, and the questions that need answering before opening.
Keep passwords, account numbers, access codes and confidential files out of the brief. Agree a secure way to exchange any sensitive information later.
For a Cranbourne West move, use this brief to request an IT readiness call. For other suburbs, discuss your premises IT plan. If email, staff accounts or shared files are the main job, request a Microsoft 365 quote.
Three months before the move
- Order business internet for the new address and ask about lead times, installation and what speeds are available.
- Decide whether you need a backup connection. If tills, dispatch or production stop without internet, a second connection or mobile backup is worth pricing now.
- Check your contracts. Note notice periods and end dates for internet, phones, printers and any equipment leases at the old site.
- Get the floor plan and mark where each team will work, including offices, workshop benches, dispatch desks and the counter.
Six to eight weeks before
- Plan network points and the comms cabinet with your electrician or cabler. Include printers, label printers, payment terminals, screens and cameras, not just desks.
- Plan Wi-Fi coverage. Racking, machinery, cool rooms and metal walls all block signal, so place access points where people and scanners actually work.
- Arrange your phone numbers. Confirm your numbers can move to the new site and when the switch will happen. Our business phone systems page covers number transfers.
- Update your address with your internet provider, bank, suppliers and on your website and Google Business Profile, ready to switch on moving day.
Two to four weeks before
- Order new equipment such as computers, network switches, Wi-Fi access points and printers, with time to set them up before the move.
- Label everything that’s moving, including cables and power packs, with where it’s going at the new site.
- Check your backups and make sure important files and systems can be restored if something is damaged in transit.
- Confirm the internet install date and that someone will be on site to let the technician in.
Move week
- Shut computers down properly before they’re packed.
- Connect and test internet, Wi-Fi and the network before staff arrive.
- Set up printers, label printers, scanners, tills and payment terminals, then test each one.
- Make and receive test calls, including calls to any queues or after-hours messages.
- Sign in as a staff member and check email, shared files and business software.
The first week in
- Ask each team what isn’t working or is slower than before, and fix the most disruptive problems first.
- Walk the site with a phone or scanner to find Wi-Fi black spots.
- Cancel services at the old address once you’re sure they’re no longer needed.
- Record what was installed, where, and who looks after it, ready for the next change.
Moving into Cranbourne West? See our Cranbourne West IT page and day-one checklist.
Common questions
How early should we order internet for new business premises?
As soon as you know the address and handover date. Some connections are ready in days, but new lines or fibre builds can take weeks. Ordering early also gives you time to arrange a backup connection or a temporary 4G or 5G service if needed.
Can we keep our business phone numbers when we move?
Usually, yes. Mobile numbers and most VoIP numbers move easily. Geographic landline numbers are tied to an area, so check with your provider before you commit to the new site, especially if you’re moving further away.
Who should we talk to before the cabling is installed?
Your electrician or cabler, your internet provider and whoever looks after your IT. Agree where network points, the comms cabinet, Wi-Fi access points, printers and screens will go before walls are closed in.
What should we test before opening day?
Test what each team needs where they will use it: open a job file on the factory floor, print and scan a freight label in the warehouse, take a test payment at the counter, make and receive calls, and check that everyone can sign in to email and shared files.